The stretch ceiling is mounted in two stages. First — a baguette is attached to the walls, then the heat -shrink film is suspended to the ceiling and heated the room with a heat gun. Heat gives the film elasticity and increases its size by 5-7%. At this time, the mounting team fixes the film in the baguette. When the usual temperature is set in the room, the film is pulled. The result is a stretch ceiling with a perfectly smooth surface. For a specific room, the film is cut out according to its size. As a rule, after measurements are made, 3-5 business days go to the manufacture of the canvas. The ceiling is mounted at a convenient time for the customer. During the working day, the installation team can install stretch ceilings with an area of up to 30 m2. On average, it takes half a day for the installation of one ceiling.