The laying of a new roof is carried out only on the prepared basis. First, it is necessary to process the covered surface with the bitumen-polymer mastic of special brands, then you can fix it with a mechanical way. There is another way: the lower side of the soft roof is placed by the construction hairdryer, then it is pressed to the clean surface.