In another case, provided for by the project in the amount of 1600 pcs. hanging piles for one of the buildings in Texas were replaced by a reinforced concrete slab. Replacing the pile structure with a plate did not cause exaggerated precipitation; Its value did not exceed the usual precipitation for buildings of a given area built on a pile base.