Installation of the frame is best to start by marking the place where it will be installed. To do this, its location is noted on the floor, then the profile itself is installed and fastened with dowels. The same profile is installed on the wall conjugated with the partition. After that, using the already fixed parts of the frame and to accurately observe geometry, the building level can be attached to the ceiling part of the profile. After installing and strengthening the profile with stiffeners, you can proceed to its lining with drywall sheets, laying the wiring and all the necessary communications.