After all the preparatory procedures, laying the tile layer itself begins. It is laid as follows: strictly from the bottom up and at the same time from left to right. The most extreme tiles, as well as the tiles adjacent to something, must be attached by nurse through the holes, drilled before starting work. The rest of the tile must be mounted without additional fixing on the crate (the exception is those regions that are often prone to strong storms and winds),