It is necessary to leave a small gap between the corner and the edge of the chipboard to install the edge. To fix the edge to the chipboard, use liquid nails. The side racks of the mezzanine are attached to the wall with dowels or screws. Then attach the upper and lower base should be attached. The final stage is the door hanging.