The option of performing floors on the veranda and concrete is possible. Unlike adobe, they are colder, but more durable. Before laying concrete, they are sealing and pouring soil cement. The thickness of the flooded solution should be 30 cm. Then the surface is leveled, and after solidifying the composition, a layer of cement is again poured onto the surface, this time a thickness of B15 cm. Then the surface is wiped and iron is performed. Ultimately cover such a floor with tiles or roll material.