Another method — the columns are placed, aligned and poured with concrete immediately (but with the exact distance between themselves). Further, the euro -collection plates are neatly inserted into the grooves and recruited. It should be noted that the slabs must be kept correctly, in which occasions do not turn them up lying — this will lead to the split of the stove and even getting an injury. This method is more time -consuming and will require more people, because the plates are not easy.