On the photo. 456 shows the destructive foundation of one building of the plant, processing sulfate alkalis.

In this foundation, large cracks were found (457). Liquid production waste was allocated here along the grooves of the floor. Through the pavement of the tile floor formed in the asphalt preparation of the tile, caustic solutions penetrated into the laying of the foundation and performed their destructive effect there. This kind of destruction took place in most foundations located along the gutter that diverted caustic fluid.