If the foundations of individual pillars are located close to each other and have a relatively small height to the first cut, then each pair of foundations can be interconnected using double -barrel beams installed on both sides of the foundation, the lines are installed in such a way that the lower part of the foundation is before the first cutting turned out to be clamped between the shelves of the beams.