Then the laying of the panels begins. The first panels are laid along the lines, at the intersection of which there is a starting point. Also, in sequentially in two directions, laying the remaining panels continues. The last panels are laid around the perimeter, if necessary, they can be cut. Use for laying around the perimeter, overlaid panels having a width of less than 20 cm is not desirable. If glue was used to fasten the racks, then at the end of the installation within 48 hours it is not recommended to walk on the false floor.