The cases of a deeply losing foundation in Berlin are not highlighted for passing three single -track tunnels.
Due to the complexity of the location of the tunnel paths in this place and with the need for the simultaneous building of the foundation for a ten -story building, it was necessary to abandon the usual subcutting method of the tunnel under the houses.