All work performed should be recorded on the drawings indicating and sketching parts. It is necessary to accommodate the composition of concrete, the depth of each drop -down column of the foundation, the amount of load used in the pressure of the foundations, and the leveling records of observations over the state of the structure and its precipitation.
Why is it so important to do all the work performed in the drawings