The creation of a sewage system, as well as the replacement of the pipeline, as well as work with electrical wiring, require the participation of a specialist. Laid communications will not require repairs for a long time if they make them in accordance with the standards. The choice of place also plays an important role. The construction of a deep hole for a septic tank will require significant physical costs. And only for those who independently manufactured construction or took a direct part in it, such work will not seem difficult. So, the land in Tatishchevo, purchased for the construction of a cottage, has its soil for independent construction work.