1) when summing up the foundations by lowering individual pillars, completely under the entire wall of the building to a depth of 10 m with sandy dry soil stratums, the cost of summing up 1 ON. m expressed in the amount of 1100-200 rubles.;
1) when summing up the foundations by lowering individual pillars, completely under the entire wall of the building to a depth of 10 m with sandy dry soil stratums, the cost of summing up 1 ON. m expressed in the amount of 1100-200 rubles.;