After we knocked out all the cracks and cavities in the old screed, we should proceed to grinding the base, which is necessary to remove the remaining surface layer of concrete. During and after the work of grinding, a layer of dust forms on the surface of concrete, which after the end of the work must be removed. Now you should wait 24 hours, and only then continue repair work.