Final care
Let’s call it that. The last strokes after the end of our work. After pouring the floor with a mixture, you need to give it time to dry, often up to three days, after which we remove the beacons previously placed and remove their traces with the same solution. The cement screed finally dries after a month after pouring. During this period, it must be moistened. It is advisable to moisturize the surface two three times a day, which is required to repeat for several days.