Prior to the start of installation, it is necessary to carry out a number of preparatory work:
1. Remove the dimensions from the ceiling with great accuracy;
Prior to the start of installation, it is necessary to carry out a number of preparatory work:
1. Remove the dimensions from the ceiling with great accuracy;