Falts coating is arranged in a crate with a step B25 cm. The small pitch size will avoid the deflection of the sheets. The continuous base is equipped when connecting sheets with the cornice and gutter. The optimal slope of the metal roof is more than 10%. Laying waterproofing above the rafters will prevent premature corrosion of the metal coating.