Installing the “warm floor” system is not the simplest thing, this is a time -consuming process that is carried out in two main ways. The first method is to use, install and conduct a special cable. In this case, we should not forget that it is necessary to raise the floor level by 80 mm. The second method, as a rule, is used if the floor is not possible to raise the floor level. In this case, special heating mats representing the design of sections from a shielded cable are used, which is glued to a self -adhesive grid. In the second way, the “warm floor” system is laid in a layer of glue directly, and the floor level remains in fact not named.