For rand beams, concrete with temporary resistance after 28 days at least 180 kg \ cm2 should be used.
It is not necessary to bind the internal and external reinforced concrete ranges. Boiled mines and pillows of stuffed piles should not be ground to the lower plane of the Rand Balki or the foundation in the absence of a rand bar, leaving a clearing of about 0.5 m.