Then everyone is covered with a plastic film, pouring the sand moistened with water, leaving all this for ten days. Five days later, remove the film, the screed is left to dry for half a month. After that, they are already laminated.
Then everyone is covered with a plastic film, pouring the sand moistened with water, leaving all this for ten days. Five days later, remove the film, the screed is left to dry for half a month. After that, they are already laminated.