Before starting work, you need to prepare the surface: remove old wallpaper, remove dust and dirt, clean the old paint, rust or oil spots. To improve further adhesion of putty with a wall, we apply a primer penetration with antibacterial properties to the prepared surface with a roller. It dries within 3-4 hours.