This space of the room will take a concrete screed on which the warm floor will be laid. Decide to put the warm floor under the tile, make it so that in one period and other types of repair work in the room in this period: thereby “kill two birds with one stone”. By the way, you can do without screed and insulate the floor under the tile using heating mats and infrared film.